An assessment of construction projects cost overruns in the public sector

Clinton Aigbavboa Jerminah Khabisi
The purpose of this study was to identify factors that influence project cost overrun within public sector construction projects with specific reference to Gauteng Province of South Africa. The primary data was collected by means of structured questionnaires which were distributed to practicing construction professionals who are engaged in various dimension in public sector construction projects. The secondary data was derived through reviewed literature. Out of 120 questionnaires sent out, 119 were received, which represented...
This data repository is not currently reporting usage information. For information on how your repository can submit usage information, please see our documentation.