Beam injection and dumping systems

C. Bracco, M.J. Barnes & A. Lechner
The beam transfer into the LHC is achieved by the two transfer lines TI2 and TI8, together with the septum and injection kickers, plus associated systems to ensure the protection of the LHC elements in case of a mis- steered beam. The foreseen increase in injected intensity and brightness for the HL-LHC means that the protection functionality of the beam-intercepting devices (TDI) needs upgrading. In addition, the higher beam current significantly increases the beam-induced power...
This data repository is not currently reporting usage information. For information on how your repository can submit usage information, please see our documentation.