Modelling constructed wetlands for CSO treatment in long-term pollution load simulation

I. Kaufmann & T. G. Schmitt
In combined sewer systems an enhanced treatment of combined sewer overflow (CSO) is required, when augmented water quality requirements are demanded or conventional CSO treatment does not meet environmental quality standards. Constructed wetlands (CWs) have become the most common method to provide enhanced treatment of CSO in Germany. As simulation models are an important tool in planning urban drainage systems, enhanced treatment devices need to be implemented in the computing procedures. A new module for...

1 Related Work

Modelling constructed wetlands for CSO treatment in long-term pollution load simulation

I. Kaufmann & T. G. Schmitt
In combined sewer systems an enhanced treatment of combined sewer overflow (CSO) is required, when augmented water quality requirements are demanded or conventional CSO treatment does not meet environmental quality standards. Constructed wetlands (CWs) have become the most common method to provide enhanced treatment of CSO in Germany. As simulation models are an important tool in planning urban drainage systems, enhanced treatment devices need to be implemented in the computing procedures. A new module for...

Resource Types

  • Event
    1

Publication Year

  • 2005
    1

Data Centers

  • DTIC Datacenter
    1