CSO detention tanks in Barcelona: Real time control design and operation

I. Escaler, A. Gil, R. Guasch & J. M. Verdejo
The environmental concern in the sewerage field has led Barcelona to build and operate its first CSO (combined sewer overflow) detention tank. It has been built in the zone of Forum de les Cultures 2004 and its main objective is the environmental protection of the new area seafront. This tank will be part of the Remote Control System of Barcelona\342\200\231s sewer network so its regulation strategy has been designed. This paper presents the design process...

1 Related Work

CSO detention tanks in Barcelona: Real time control design and operation

I. Escaler, A. Gil, R. Guasch & J. M. Verdejo
The environmental concern in the sewerage field has led Barcelona to build and operate its first CSO (combined sewer overflow) detention tank. It has been built in the zone of Forum de les Cultures 2004 and its main objective is the environmental protection of the new area seafront. This tank will be part of the Remote Control System of Barcelona\342\200\231s sewer network so its regulation strategy has been designed. This paper presents the design process...

Publication Year

  • 2005
    1

Data Centers

  • DTIC Datacenter
    1