Deliverable Report D1.1 Requirements Analysis And Systems Design

Barry Hardy Markus Hegi
The objective of WP 1 is, to enable the communication between the eNanoMapper project and the wider nanosafety community and to ensure the alignment of the objectives of eNanoMapper with the needs of the community. At the start of the project, an extensive requirements analysis was conducted and based on the results, an overall system design was worked out. The process was based on the methodology of Contextual Design and included five steps, each building...