Hydrogen Turbines Follow On - Scenario 5 Results Pack - Power sector CCS and H2 Turbine Asset Modelling

Various scenarios for the UK’s power fleet composition in 2030 and 2040 were developed. Dispatch modelling in Plexos was carried out by Baringa on these fleets to investigate the role gas-fed plants might have in future. This includes the ability to study load factors, stop/starts etc., and together with concomitant pricing, provide a picture of investment remuneration.The effect of key drivers is studied e.g. gas price
This data repository is not currently reporting usage information. For information on how your repository can submit usage information, please see our documentation.