Biomass to Power with CCS - model requirements, specification, strategy and user documentation: T3, T4 and T5

TESBiC: Techno-Economic Study of Biomass to power with CCS. This document (from Work Package 3) provides the specification and user guidance for three, of eight, parameterised technology models that will be used by the Bioenergy Value Chain Modelling (BVCM) project.The three technologies covered in this report are biomass co-firing in a pulverised coal-fired power plant with post combustion amine scrubbing-based carbon capture, biomass combustion in a dedicated power plant with carbon capture by solvent scrubbing,...
This data repository is not currently reporting usage information. For information on how your repository can submit usage information, please see our documentation.