Hydrogen Turbines Follow On - Scenario 10 Results Pack - Cost-optimal pathways to decarbonising the GB power sector - Final Report

Optimal annual decarbonisation pathways to 2050 considering capacity and operational dispatch requirements, and current policy momentum effectsETI commissioned Baringa to undertake detailed analysis of what the cost optimal power sector capacity mix could look like around the 2030 point on the pathway to 2050, which allows for feasible operation (in line with GB’s reliability standard for a loss of load expectation of 3 hours per year) and which is consistent with a trajectory that enables...
This data repository is not currently reporting usage information. For information on how your repository can submit usage information, please see our documentation.